- Working Area of 6500 Sqmts.
- 1 Automated Conveyor Line for Unitised System Assembly and Glazing (1 more planned).
- Daily working in two shift basis (3rd shift as when required).
- Daily Capacity of 60 Unitised Panels per 8 hour shift.
- Independent divisions for ACP Fabrication, Aluminium Fabrication / Assembly / Glazing, DGU Manufacturing
| FABRICATION & ASSEMBLY |
| 1 |
Imported Cutting Machine |
2 |
| 2 |
Imported Notching Machine |
1 |
| 3 |
Gang Drill Machine |
2 |
| 4 |
Crimping Machine |
1 |
| 5 |
Double Cutting Machine |
3 |
| 6 |
Angle Cutting Machine |
1 |
| 7 |
Milling Machine |
1 |
| 8 |
Press Machine |
6 |
| 9 |
Grinding Machine |
1 |
| 10 |
Slitting Machine |
2 |
| 11 |
Pneumatic Press Machine |
1 |
| 12 |
Imported Drilling Machine |
6 |
| 13 |
Hand Drill Machine |
1 |
| GLAZING |
| 14 |
Imported Conveyer Line Glazing |
1 |
| 15 |
2 Part Glazing Pump |
3 |
| 16 |
Chiller M/C |
2 |
| 17 |
DGU Washing Machine |
1 |
| 18 |
DGU Pressing Machine |
1 |
| 19 |
Spacer Bar Cutting Machine |
1 |
| 20 |
Butyl M/C |
1 |
| 21 |
Hot Melt Machine |
1 |
| ACP FABRICATION |
| 22 |
Striebig ACP Fabrication Machine |
2 |
|
|
|
|
|
|
|
|
|